Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Oswald Road - Chorlton Cum Hardy

Oswald Road, Chorlton Cum Hardy, Old Trafford, M21 9QD

Oswald Road - Chorlton Cum Hardy is an EV charging site in Old Trafford, Trafford, run by Be.EV and open 24 hours a day. Both of its sockets are 7 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 10 pm, and Amp Map measured 93% uptime and recorded 94 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Longford Park Car Park (Be.EV), 0.4 miles away.

Status

1 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 59p per kWh1 free1 out of service
BVFGM0095-A100% reliabilityAvailable
BVFGM0095-B87% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVFGM0095-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Oswald Road - Chorlton Cum Hardy (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Oswald Road - Chorlton Cum Hardy (Be.EV)?

Up to 7 kW AC via Type 2.

How many charging sockets does Oswald Road - Chorlton Cum Hardy (Be.EV) have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Oswald Road - Chorlton Cum Hardy (Be.EV) open 24/7?

Yes - Oswald Road - Chorlton Cum Hardy (Be.EV) is open 24 hours a day, 7 days a week.

When is Oswald Road - Chorlton Cum Hardy (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

How reliable is Oswald Road - Chorlton Cum Hardy (Be.EV)?

Amp Map measured 93% uptime here from recorded live status over the last 30 days, across 94 observed charging sessions.

Who operates Oswald Road - Chorlton Cum Hardy?

Oswald Road - Chorlton Cum Hardy is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Oswald Road - Chorlton Cum Hardy (Be.EV)?

Longford Park Car Park (Be.EV) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Oswald Road - Chorlton Cum Hardy (Be.EV)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oswald Road - Chorlton Cum Hardy (Be.EV)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Oswald Road - Chorlton Cum Hardy (Be.EV)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.