Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Quay Road Saint Agnes

Trevaunance Cove, Redruth, TR5 0RT

Quay Road Saint Agnes is an EV charging site in Redruth, Cornwall, run by Be.EV and open 24 hours a day. Its 3 sockets reach up to 75 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 96% uptime and recorded 144 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Trevissome Park (GeniePoint), 3.1 miles away.

Status

2 of 3 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW2 connectors · 89p per kWh1 free1 in use
RTM0066-194% reliabilityCharging
RTM0066-295% reliabilityAvailable
Type 2 · 22 kW1 connector · 59p per kWh1 free
AC00140-1100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AC00140-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW89p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Quay Road Saint Agnes (Be.EV)?

The listed price is Type 2 £0.59/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Quay Road Saint Agnes (Be.EV)?

Up to 75 kW DC via Type 2, CCS.

How many charging sockets does Quay Road Saint Agnes (Be.EV) have?

3 charging sockets: 1 × 22 kW Type 2, 2 × 75 kW CCS. Live per-socket availability is shown on this page.

Is Quay Road Saint Agnes (Be.EV) open 24/7?

Yes - Quay Road Saint Agnes (Be.EV) is open 24 hours a day, 7 days a week.

When is Quay Road Saint Agnes (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Quay Road Saint Agnes (Be.EV)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 144 observed charging sessions.

Who operates Quay Road Saint Agnes?

Quay Road Saint Agnes is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Quay Road Saint Agnes (Be.EV)?

Trevissome Park (GeniePoint) is 3.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Quay Road Saint Agnes (Be.EV)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Quay Road Saint Agnes (Be.EV)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Quay Road Saint Agnes (Be.EV)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.