Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Shiremoor District Centre

Northumberland Retail Centre, Northumberland, Whitley Bay, NE27 0SJ

Shiremoor District Centre is an EV charging site in Whitley Bay, North Tyneside, run by Be.EV and open 24 hours a day. All 6 of its sockets are 300 kW CCS, and the published price is £0.79 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Northumberland Retail Park, Newcastle upon Tyne (Osprey Charging), 0.3 miles away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW6 connectors · 79p per kWh6 free
BEEV66-01100% reliabilityAvailable
BEEV66-02100% reliabilityAvailable
BEEV66-03Available
BEEV66-04100% reliabilityAvailable
BEEV66-05100% reliabilityAvailable
BEEV66-06100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
BEEV66-01

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW79p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£44
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£32
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£40
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£40
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£34
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£32

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Shiremoor District Centre (Be.EV)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Shiremoor District Centre (Be.EV)?

Up to 300 kW DC via CCS.

How many charging sockets does Shiremoor District Centre (Be.EV) have?

6 charging sockets: 6 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Shiremoor District Centre (Be.EV) open 24/7?

Yes - Shiremoor District Centre (Be.EV) is open 24 hours a day, 7 days a week.

When is Shiremoor District Centre (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Shiremoor District Centre (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.

Who operates Shiremoor District Centre?

Shiremoor District Centre is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Shiremoor District Centre (Be.EV)?

Northumberland Retail Park, Newcastle upon Tyne (Osprey Charging) is 0.3 miles away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Shiremoor District Centre (Be.EV)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shiremoor District Centre (Be.EV)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shiremoor District Centre (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.