Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

St. Mary’s Retail Park

St. Mary’s Gate, Rochdale, OL12 0TY

St. Mary’s Retail Park is an EV charging site in Rochdale, Borough of Rochdale, run by Be.EV and open 24 hours a day. All 8 of its sockets are 150 kW CCS, and the published price is £0.91 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 96% uptime and recorded 1866 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Rochdale Leisure Centre (Be.EV), 0.4 miles away.

Status

3 of 8 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW8 connectors · 91p per kWh3 free5 in use
BEEV06-01100% reliabilityAvailable
BEEV06-02100% reliabilityCharging
BEEV06-03100% reliabilityAvailable
BEEV06-04100% reliabilityCharging
BEEV07-0193% reliabilityCharging
BEEV07-0293% reliabilityCharging
BEEV07-0393% reliabilityAvailable
BEEV07-0493% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the Be.EV appRFID card
Charger ID
BEEV06-01
Bays
Must stay plugged in while parked

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW91p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£50
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£46
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£37

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at St. Mary’s Retail Park (Be.EV)?

The listed price is £0.91/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at St. Mary’s Retail Park (Be.EV)?

Up to 150 kW DC via CCS.

How many charging sockets does St. Mary’s Retail Park (Be.EV) have?

8 charging sockets: 8 × 150 kW CCS. Live per-socket availability is shown on this page.

Is St. Mary’s Retail Park (Be.EV) open 24/7?

Yes - St. Mary’s Retail Park (Be.EV) is open 24 hours a day, 7 days a week.

When is St. Mary’s Retail Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is St. Mary’s Retail Park (Be.EV)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 1866 observed charging sessions.

Who operates St. Mary’s Retail Park?

St. Mary’s Retail Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to St. Mary’s Retail Park (Be.EV)?

Rochdale Leisure Centre (Be.EV) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at St. Mary’s Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£50 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St. Mary’s Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at St. Mary’s Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.