Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

The Point Retail Park

Molesworth Street, Rochdale, OL16 1TS

The Point Retail Park is an EV charging site in Rochdale, Borough of Rochdale, run by POGO. All 6 of its sockets are 50 kW CCS and CHAdeMO, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 74% uptime and recorded 127 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Rochdale Leisure Centre (Be.EV), 0.1 miles away.

Status

2 of 6 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW3 connectors · 65p per kWh1 free2 in use
PoGo2000132% reliabilityCharging
PoGo2000294% reliabilityCharging
PoGo2000354% reliabilityAvailable
CHAdeMO · 50 kW3 connectors · 65p per kWh1 free2 out of service
PoGo2000132% reliabilityOut of order
PoGo2000294% reliabilityOut of order
PoGo2000354% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo20001

Always check directly with the charge point operator for the most up-to-date information.

Prices

65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at The Point Retail Park (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at The Point Retail Park (POGO)?

Up to 50 kW DC via CCS, CHAdeMO.

How many charging sockets does The Point Retail Park (POGO) have?

6 charging sockets: 3 × 50 kW CCS, 3 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

When is The Point Retail Park (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is The Point Retail Park (POGO)?

Amp Map measured 74% uptime here from recorded live status over the last 30 days, across 127 observed charging sessions.

Who operates The Point Retail Park?

The Point Retail Park is on the POGO network.

Where is the nearest other charger with 50 kW or more to The Point Retail Park (POGO)?

Rochdale Leisure Centre (Be.EV) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Point Retail Park (POGO)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Point Retail Park (POGO)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Point Retail Park (POGO)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.