Be.EV · EV charging site
The D'Urberville Centre
D'Urberville Centre, Colliers Lane, Dorchester, BH20 6DL
The D'Urberville Centre is an EV charging site in Dorchester, Dorset, run by Be.EV and open 24 hours a day. Its 4 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.59 to £0.84 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 93% uptime and recorded 138 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Howard's Lane Car Park (MER), 5 miles away.
Status
3 of 4 available
Checking status…
Connectors
CCS · 50 kW
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Be.EV
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- In the Be.EV app
- Charger ID
- ALW0061-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 84p per kWh |
| Type 2 | 7 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The D'Urberville Centre (Be.EV)?
The listed price is Type 2 £0.59/kWh · CCS £0.84/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The D'Urberville Centre (Be.EV)?
Up to 50 kW DC via Type 2, CCS.
How many charging sockets does The D'Urberville Centre (Be.EV) have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is The D'Urberville Centre (Be.EV) open 24/7?
Yes - The D'Urberville Centre (Be.EV) is open 24 hours a day, 7 days a week.
When is The D'Urberville Centre (Be.EV) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is The D'Urberville Centre (Be.EV)?
Amp Map measured 93% uptime here from recorded live status over the last 30 days, across 138 observed charging sessions.
Who operates The D'Urberville Centre?
The D'Urberville Centre is on the Be.EV network.
Where is the nearest other charger with 50 kW or more to The D'Urberville Centre (Be.EV)?
Howard's Lane Car Park (MER) is 5 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The D'Urberville Centre (Be.EV)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The D'Urberville Centre (Be.EV)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The D'Urberville Centre (Be.EV)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.