Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

The Furlong

The Furlong, Ferndown, BH24 1AT

The Furlong is an EV charging site in Ferndown, Dorset, run by Be.EV and open 24 hours a day. Its 12 sockets reach up to 150 kW, with CCS at the top speed, and published prices run from £0.84 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 80% uptime and recorded 1234 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Furlong Short Stay Car Park (Be.EV), 30 yards away.

Status

10 of 12 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW11 connectors · 89p per kWh9 free2 out of service
KM0097-189% reliabilityAvailable
KM0097-289% reliabilityAvailable
KM0097-389% reliabilityAvailable
KM0097-489% reliabilityAvailable
KM0097-50% reliabilityOut of order
KM0097-60% reliabilityOut of order
KM0098-1100% reliabilityAvailable
KM0098-2100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 84p per kWh1 free
KM0098-6100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
KM0097-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh
CHAdeMO50 kW84p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at The Furlong (Be.EV)?

The listed price is CCS £0.89/kWh · CHAdeMO £0.84/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at The Furlong (Be.EV)?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does The Furlong (Be.EV) have?

12 charging sockets: 11 × 150 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is The Furlong (Be.EV) open 24/7?

Yes - The Furlong (Be.EV) is open 24 hours a day, 7 days a week.

When is The Furlong (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is The Furlong (Be.EV)?

Amp Map measured 80% uptime here from recorded live status over the last 30 days, across 1234 observed charging sessions.

Who operates The Furlong?

The Furlong is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to The Furlong (Be.EV)?

The Furlong Short Stay Car Park (Be.EV) is 30 yards away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Furlong (Be.EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Furlong (Be.EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Furlong (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.