Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

The Seam

Car Park (Lower), Barnsley, S70 2EQ

The Seam is an EV charging site in Barnsley, run by Be.EV and open 24 hours a day. Its 12 sockets reach up to 300 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 98% uptime and recorded 667 charging sessions here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Barnsley (GeniePoint), 0.5 miles away.

Status

10 of 12 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW4 connectors · 89p per kWh3 free1 in use
ALW0065-1100% reliabilityCharging
ALW0065-2100% reliabilityAvailable
ALW0066-1100% reliabilityAvailable
ALW0066-2100% reliabilityAvailable
Type 2 · 7 kW8 connectors · 59p per kWh7 free1 in use
BEEVF0023-197% reliabilityAvailable
BEEVF0023-297% reliabilityCharging
BEEVF0024-1100% reliabilityAvailable
BEEVF0024-2100% reliabilityAvailable
BEEVF0025-1100% reliabilityAvailable
BEEVF0025-2100% reliabilityAvailable
BEEVF0026-193% reliabilityAvailable
BEEVF0026-293% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the Be.EV appRFID card
Charger ID
ALW0065-1
Bays
Must stay plugged in while parked

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW89p per kWh
Type 27 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at The Seam (Be.EV)?

The listed price is CCS £0.89/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at The Seam (Be.EV)?

Up to 300 kW DC via CCS, Type 2.

How many charging sockets does The Seam (Be.EV) have?

12 charging sockets: 4 × 300 kW CCS, 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is The Seam (Be.EV) open 24/7?

Yes - The Seam (Be.EV) is open 24 hours a day, 7 days a week.

When is The Seam (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is The Seam (Be.EV)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 667 observed charging sessions.

Who operates The Seam?

The Seam is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to The Seam (Be.EV)?

Morrisons Barnsley (GeniePoint) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Seam (Be.EV)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Seam (Be.EV)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Seam (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.