GeniePoint · EV charging site
Morrisons Barnsley
Lower Thomas Street, Barnsley, S70 1LQ
Morrisons Barnsley is an EV charging site in Barnsley, run by GeniePoint. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Barnsley Westway (GeniePoint), 130 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- Geniepoint 50kW Rapid (£1 fee + 30p per kWh) AC is a 22kW Socket (50p fee + 30 per per kWh)(from Open Charge Map, 3 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- 10.00 overstay fee after 95 mins, then £10.00 every subsequent 95 mins
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Barnsley (GeniePoint)?
The listed price is Geniepoint 50kW Rapid (£1 fee + 30p per kWh) AC is a 22kW Socket (50p fee + 30 per per kWh). Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Barnsley (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Morrisons Barnsley (GeniePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Morrisons Barnsley?
Morrisons Barnsley is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Barnsley (GeniePoint)?
Morrisons Barnsley Westway (GeniePoint) is 130 yards away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Barnsley (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Barnsley (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Barnsley (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Barnsley Westway
- Mark Street Commuter Car Park, Barnsley 1
- Mark Street Commuter Car Park, Barnsley 3
- The Glassworks Shopper Car Park
- Kendray Street
- Market Gate Shopper Car Park, Barnsley 7
- Cheapest nearby
- The Glassworks Shopper Car Park · 64p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Morrisons Barnsley Westway · 60 kW · 130 yd