Blink Charging · EV charging site
Mark Street Commuter Car Park, Barnsley 1
Mark Street, Barnsley, S70 1BA
Mark Street Commuter Car Park, Barnsley 1 is an EV charging site in Barnsley, run by Blink Charging. It has a single 7 kW Type 2 socket. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Barnsley (GeniePoint), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mark Street Commuter Car Park, Barnsley 1 (Blink Charging)?
Up to 7 kW AC via Type 2.
How many charging sockets does Mark Street Commuter Car Park, Barnsley 1 (Blink Charging) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Mark Street Commuter Car Park, Barnsley 1?
Mark Street Commuter Car Park, Barnsley 1 is on the Blink Charging network.
Where is the nearest charger with 50 kW or more to Mark Street Commuter Car Park, Barnsley 1 (Blink Charging)?
Morrisons Barnsley (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mark Street Commuter Car Park, Barnsley 1 (Blink Charging)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mark Street Commuter Car Park, Barnsley 1 (Blink Charging)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mark Street Commuter Car Park, Barnsley 1 (Blink Charging)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Mark Street Commuter Car Park, Barnsley 3
- Morrisons Barnsley
- Morrisons Barnsley Westway
- Sackville Street Car Park
- The Glassworks Shopper Car Park
- Kendray Street
- Cheapest nearby
- Sackville Street Car Park · 64p per kWh · 22 kW · 0.3 mi
- Fastest nearby
- Morrisons Barnsley Westway · 60 kW · 0.2 mi