Believ · EV charging site
Linden Avenue
Linden Avenue, Kettering, NN16 0EP
Linden Avenue is an EV charging site in Kettering, North Northamptonshire, run by Believ. Both of its sockets are 22 kW Type 2. 23 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Meadow Road (Believ), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Believ
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Linden Avenue (Believ)?
Up to 22 kW AC via Type 2.
How many charging sockets does Linden Avenue (Believ) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Linden Avenue?
Linden Avenue is on the Believ network.
Where is the nearest charger with 50 kW or more to Linden Avenue (Believ)?
Meadow Road (Believ) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Linden Avenue (Believ)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Linden Avenue (Believ)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Linden Avenue (Believ)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.