Blink Charging · EV charging site
Cattle Market Car Park
14 Bridge Street, Frome, BA11 3HY
Cattle Market Car Park is an EV charging site in Frome, Somerset, run by Blink Charging. All 6 of its sockets are 22 kW Type 2, and the price is listed as £0.69/kWh. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Frome Station Approach car park (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.69/kWh(from Open Charge Map, 9 Feb 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cattle Market Car Park (Blink Charging)?
The listed price is £0.69/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Cattle Market Car Park (Blink Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Cattle Market Car Park (Blink Charging) have?
6 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates Cattle Market Car Park?
Cattle Market Car Park is on the Blink Charging network.
Where is the nearest charger with 50 kW or more to Cattle Market Car Park (Blink Charging)?
Frome Station Approach car park (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cattle Market Car Park (Blink Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cattle Market Car Park (Blink Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cattle Market Car Park (Blink Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheese and Grain
- Frome Town Council
- Nunney Road
- Frome Football Club
- Frome Medical Practice
- Frome Station Approach car park
- Cheapest nearby
- Frome Station Approach car park · 65p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Frome Station Approach car park · 50 kW · 0.6 mi