Zero Carbon World · EV charging site
Cheese and Grain
Market Yard, Frome, BA11 1BE
Cheese and Grain is an EV charging site in Frome, Somerset, run by Zero Carbon World. Both of its sockets are 7 kW Type 2, and charging is listed as free. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Frome Station Approach car park (BP Pulse), 0.6 miles away.
Status
Temporarily closed
Listed as temporarily closed. Check before you travel.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 30 Dec 2019)
- Phone (from Open Charge Map)
- 01373 455768
- Notes
- Powered by the sun from the Cheese and Grain solar array.
- Getting there
- After entering public car park, turn right and head for the large building with solar panels on its roof. Charging Stations are under the panels, on the wall near the back of the building. Please park considerately for 2 cars to park side by side.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cheese and Grain (Zero Carbon World)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Cheese and Grain (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Cheese and Grain (Zero Carbon World) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Cheese and Grain?
Cheese and Grain is on the Zero Carbon World network. For site issues, the operator lists 01373 455768.
Where is the nearest charger with 50 kW or more to Cheese and Grain (Zero Carbon World)?
Frome Station Approach car park (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cheese and Grain (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cheese and Grain (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cheese and Grain (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cattle Market Car Park
- Frome Town Council
- Frome Football Club
- Nunney Road
- Frome Medical Practice
- Frome Station Approach car park
- Cheapest nearby
- Frome Station Approach car park · 65p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Frome Station Approach car park · 50 kW · 0.6 mi