Blink Charging · EV charging site
Northampton, Commercial Street
Commercial Street, Northampton, NN1 1PJ
Northampton, Commercial Street is an EV charging site in Northampton, West Northamptonshire, run by Blink Charging. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Northampton (GeniePoint), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Northampton, Commercial Street (Blink Charging)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Northampton, Commercial Street (Blink Charging) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW Type 2.
Who operates Northampton, Commercial Street?
Northampton, Commercial Street is on the Blink Charging network.
Where is the nearest other charger with 50 kW or more to Northampton, Commercial Street (Blink Charging)?
Morrisons Northampton (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Northampton, Commercial Street (Blink Charging)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northampton, Commercial Street (Blink Charging)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Northampton, Commercial Street (Blink Charging)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Northampton
- Morrisons Northampton
- Northampton, Newlands
- Northampton, Wellington Street
- Northampton, Upper Mounts
- St James Park Road
- Fastest nearby
- Morrisons Northampton · 60 kW · 0.3 mi