Blink Charging · EV charging site
Northampton, Newlands
Newland, Northampton, NN1 3EL
Northampton, Newlands is an EV charging site in Northampton, West Northamptonshire, run by Blink Charging. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Northampton, Upper Mounts (Blink Charging), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Northampton, Newlands (Blink Charging)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Northampton, Newlands (Blink Charging) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Northampton, Newlands?
Northampton, Newlands is on the Blink Charging network.
Where is the nearest other charger with 50 kW or more to Northampton, Newlands (Blink Charging)?
Northampton, Upper Mounts (Blink Charging) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Northampton, Newlands (Blink Charging)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northampton, Newlands (Blink Charging)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Northampton, Newlands (Blink Charging)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Northampton, Upper Mounts
- Northampton, Wellington Street
- Northampton, Commercial Street
- Morrisons Northampton
- Morrisons Northampton
- NGH
- Fastest nearby
- Morrisons Northampton · 60 kW · 0.4 mi