NGH · EV charging site
NGH
Cliftonville, Northampton, NN1 5BD
NGH is an EV charging site at Cliftonville in Northampton, West Northamptonshire, run by NGH and open 24 hours a day. All 34 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 100% uptime and recorded 204 charging sessions here over the last 30 days. Amp Map lists 1 other charge point named NGH in Northampton. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Northampton (GeniePoint), 0.4 miles away.
Status
31 of 34 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- NGH
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- Cripps (1A)
- Bays
- Must stay plugged in while parked
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at NGH?
Up to 7 kW AC via Type 2.
How many charging sockets does NGH have?
34 charging sockets: 34 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is NGH open 24/7?
Yes - NGH is open 24 hours a day, 7 days a week.
When is NGH busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is NGH?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 204 observed charging sessions.
Who operates NGH?
NGH is on the NGH network.
Where is the nearest charger with 50 kW or more to NGH?
Morrisons Northampton (GeniePoint) is 0.4 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at NGH?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NGH?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at NGH?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- NGH
- Morrisons Northampton
- Northampton, Wellington Street
- Morrisons Northampton
- GB-LCL-A0100
- Northampton, Newlands
- Fastest nearby
- Morrisons Northampton · 60 kW · 0.4 mi