Blink Charging · EV charging site
Preston Park, Stockton-on-Tees
Yarm Road, Thornaby-on-Tees, TS18 3RH
Preston Park, Stockton-on-Tees is an EV charging site in Thornaby-on-Tees, Stockton-on-Tees, run by Blink Charging. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bannatyne Health Club & Spa - Ingleby (InstaVolt Ltd), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Preston Park, Stockton-on-Tees (Blink Charging)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Preston Park, Stockton-on-Tees (Blink Charging) have?
3 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Preston Park, Stockton-on-Tees?
Preston Park, Stockton-on-Tees is on the Blink Charging network.
Where is the nearest other charger with 50 kW or more to Preston Park, Stockton-on-Tees (Blink Charging)?
Bannatyne Health Club & Spa - Ingleby (InstaVolt Ltd) is 1.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Preston Park, Stockton-on-Tees (Blink Charging)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Preston Park, Stockton-on-Tees (Blink Charging)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Preston Park, Stockton-on-Tees (Blink Charging)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.