Zero Carbon World · EV charging site
Best Western Parkmore Hotel & Leisure Club
636 Yarm Rd, TS16 0DH
Best Western Parkmore Hotel & Leisure Club is an EV charging site in Yarm, Stockton-on-Tees, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Preston Park, Stockton-on-Tees (Blink Charging), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0845 373 0780
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Best Western Parkmore Hotel & Leisure Club (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Best Western Parkmore Hotel & Leisure Club (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Best Western Parkmore Hotel & Leisure Club?
Best Western Parkmore Hotel & Leisure Club is on the Zero Carbon World network. For site issues, the operator lists 0845 373 0780.
Where is the nearest charger with 50 kW or more to Best Western Parkmore Hotel & Leisure Club (Zero Carbon World)?
Preston Park, Stockton-on-Tees (Blink Charging) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Parkmore Hotel & Leisure Club (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Parkmore Hotel & Leisure Club (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Parkmore Hotel & Leisure Club (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Prestige Motor Services Ltd
- Preston Park, Stockton-on-Tees
- Preston Park Car Park
- Bannatyne Health Club & Spa - Ingleby
- Pod Point Tesco Superstore - Ingleby Barwick
- Tristar House
- Cheapest nearby
- Pod Point Tesco Superstore - Ingleby Barwick · 44.4p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- Preston Park, Stockton-on-Tees · 50 kW · 1 mi