Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

[E-TAXI ONLY] 3 Gladstone Avenue

Wood Green, N22 6JY

[E-TAXI ONLY] 3 Gladstone Avenue is an EV charging site in Wood Green, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CHAdeMO and CCS. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 89% uptime and recorded 145 charging sessions here over the last 30 days. 30 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MFG Lordship Lane (MFG EV Power), 0.4 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW1 connector1 free
BPT49382% reliabilityAvailable
CHAdeMO · 50 kW1 connector1 free
BPT49382% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPT493

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse)?

Up to 50 kW DC via CHAdeMO, CCS.

How many charging sockets does [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS. Live per-socket availability is shown on this page.

Is [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse) open 24/7?

Yes - [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse) is open 24 hours a day, 7 days a week.

When is [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse)?

Amp Map measured 89% uptime here from recorded live status over the last 30 days, across 145 observed charging sessions.

Who operates [E-TAXI ONLY] 3 Gladstone Avenue?

[E-TAXI ONLY] 3 Gladstone Avenue is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse)?

MFG Lordship Lane (MFG EV Power) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.