MFG EV Power · EV charging site
MFG Lordship Lane
575 Lordship Lane, Wood Green, N22 5LE
MFG Lordship Lane is an EV charging site in Wood Green, Greater London, run by MFG EV Power. It has a single socket, with CCS at up to 150 kW, and the price is listed as £0.79/kWh. 36 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is [E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 3 Apr 2023)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Lordship Lane (MFG EV Power)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Lordship Lane (MFG EV Power)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does MFG Lordship Lane (MFG EV Power) have?
1 charging socket: 2 × 150 kW CCS, 1 × 50 kW CHAdeMO.
Who operates MFG Lordship Lane?
MFG Lordship Lane is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG Lordship Lane (MFG EV Power)?
[E-TAXI ONLY] 3 Gladstone Avenue (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Lordship Lane (MFG EV Power)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Lordship Lane (MFG EV Power)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Lordship Lane (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Winkfield Road
- ubitricity Distributed Energy Systems UK Ltd. 140 Russell Avenue
- Tintern Road
- Cranbrook Park
- Mark Road
- Gathorne Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 140 Russell Avenue · 45p per kWh · 5 kW · 0.3 mi