Total Energies · EV charging site
Tintern Road
25 Tintern Road, Wood Green, N22 5LU
Tintern Road is an EV charging site in Wood Green, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 31 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Lordship Lane (MFG EV Power), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Tintern Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Tintern Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Tintern Road (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2.
Who operates Tintern Road?
Tintern Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Tintern Road (Total Energies)?
MFG Lordship Lane (MFG EV Power) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tintern Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tintern Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tintern Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Mark Road
- ubitricity Distributed Energy Systems UK Ltd. 140 Russell Avenue
- MFG Lordship Lane
- Waltheof Avenue
- [E-TAXI ONLY] 38 Great Cambridge Road
- Winkfield Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 140 Russell Avenue · 45p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- MFG Lordship Lane · 150 kW · 0.3 mi