BP Pulse · EV charging site
Armadale Service Station
Bathgate Road, EH48 2PE
Armadale Service Station is an EV charging site in Bathgate, West Lothian, run by BP Pulse and open 24 hours a day. Its 3 sockets reach up to 300 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 92% uptime and recorded 136 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Morrisons (GeniePoint), 1.8 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 300 kW
CHAdeMO · 100 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPA0148
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Armadale Service Station (BP Pulse)?
Up to 300 kW DC via CCS, CHAdeMO.
How many charging sockets does Armadale Service Station (BP Pulse) have?
3 charging sockets: 2 × 300 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Armadale Service Station (BP Pulse) open 24/7?
Yes - Armadale Service Station (BP Pulse) is open 24 hours a day, 7 days a week.
When is Armadale Service Station (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Armadale Service Station (BP Pulse)?
Amp Map measured 92% uptime here from recorded live status over the last 30 days, across 136 observed charging sessions.
Who operates Armadale Service Station?
Armadale Service Station is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Armadale Service Station (BP Pulse)?
Morrisons (GeniePoint) is 1.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Armadale Service Station (BP Pulse)?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Armadale Service Station (BP Pulse)?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Armadale Service Station (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.