GeniePoint · EV charging site
Morrisons
Linkston Way, Bathgate, EH48 7XN
Morrisons is an EV charging site in Bathgate, West Lothian, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Armadale Service Station (BP Pulse), 1.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Morrisons (GeniePoint) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW Type 2.
Who operates Morrisons?
Morrisons is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons (GeniePoint)?
Armadale Service Station (BP Pulse) is 1.8 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.