BP Pulse · EV charging site
HRL Rathgael Road
98 Rathgael Road, Bangor, BT19 1RS
HRL Rathgael Road is an EV charging site in Bangor, Ards and North Down, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 72% uptime and recorded 101 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Toscana Retail Park (Weev), 0.4 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000494
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at HRL Rathgael Road (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does HRL Rathgael Road (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is HRL Rathgael Road (BP Pulse) open 24/7?
Yes - HRL Rathgael Road (BP Pulse) is open 24 hours a day, 7 days a week.
When is HRL Rathgael Road (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is HRL Rathgael Road (BP Pulse)?
Amp Map measured 72% uptime here from recorded live status over the last 30 days, across 101 observed charging sessions.
Who operates HRL Rathgael Road?
HRL Rathgael Road is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to HRL Rathgael Road (BP Pulse)?
Toscana Retail Park (Weev) is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HRL Rathgael Road (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Rathgael Road (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HRL Rathgael Road (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.