Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Browns Wood playing fields car park

Browns Wood playing fields car park, Browns W, Bletchley, MK7 8DX

Browns Wood playing fields car park is an EV charging site in Bletchley, Milton Keynes, run by BP Pulse. Its 5 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 71% uptime and recorded 13 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Wadesmill Lane (BP Pulse), 0.5 miles away.

Status

4 of 5 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW1 connector · 89p per kWhOut of service
247010% reliabilityOut of order
Type 2 · 7 kW4 connectors · 65p per kWh4 free
13748100% reliabilityAvailable
13748100% reliabilityAvailable
13749100% reliabilityAvailable
13749100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
13748

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Browns Wood playing fields car park (BP Pulse)?

The listed price is Type 2 £0.65/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Browns Wood playing fields car park (BP Pulse)?

Up to 50 kW DC via Type 2, CCS.

How many charging sockets does Browns Wood playing fields car park (BP Pulse) have?

5 charging sockets: 4 × 7 kW Type 2, 1 × 50 kW CCS. Live per-socket availability is shown on this page.

When is Browns Wood playing fields car park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Browns Wood playing fields car park (BP Pulse)?

Amp Map measured 71% uptime here from recorded live status over the last 30 days, across 13 observed charging sessions.

Who operates Browns Wood playing fields car park?

Browns Wood playing fields car park is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Browns Wood playing fields car park (BP Pulse)?

Wadesmill Lane (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Browns Wood playing fields car park (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Browns Wood playing fields car park (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Browns Wood playing fields car park (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.