BP Pulse · EV charging site
Co-op Hallcroft
132 Hallcroft Road, Retford, DN22 7PY
Co-op Hallcroft is an EV charging site in Retford, Nottinghamshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Amp Map measured 0% uptime here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Randall Business Centre (Alfapower), 0.5 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPT066
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Co-op Hallcroft (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does Co-op Hallcroft (BP Pulse) have?
2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is Co-op Hallcroft (BP Pulse) open 24/7?
Yes - Co-op Hallcroft (BP Pulse) is open 24 hours a day, 7 days a week.
How reliable is Co-op Hallcroft (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Co-op Hallcroft?
Co-op Hallcroft is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Co-op Hallcroft (BP Pulse)?
Randall Business Centre (Alfapower) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Co-op Hallcroft (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Hallcroft (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Co-op Hallcroft (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Randall Business Centre
- Morrisons
- Pod Point Co-op Petrol Filling Station
- Chancery Lane Car Park, 11 Chancery Lane
- Chancery Lane, Retford, DN22 6eu
- EG Group Retford
- Cheapest nearby
- Pod Point Co-op Petrol Filling Station · 25.2p per kWh · 7 kW · 0.6 mi
- Fastest nearby
- EG Group Retford · 175 kW · 1.1 mi