ChargePoint · EV charging site
EG Group Retford
King Edward Services. EURO GARAGES, Retford, DN22 6AZ
EG Group Retford is an EV charging site in Retford, Nottinghamshire, run by ChargePoint. Its 8 sockets reach up to 175 kW, with Type 2 at the top speed. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chancery Lane, Retford, DN22 6eu (Charge Your Car), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EG Group Retford (ChargePoint)?
Up to 175 kW DC via CHAdeMO, Type 2.
How many charging sockets does EG Group Retford (ChargePoint) have?
8 charging sockets: 1 × 75 kW CHAdeMO, 1 × 75 kW CHAdeMO, 1 × 75 kW CHAdeMO, 1 × 75 kW CHAdeMO, 1 × 175 kW Type 2, 1 × 175 kW Type 2, 1 × 175 kW Type 2, 1 × 175 kW Type 2.
Who operates EG Group Retford?
EG Group Retford is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to EG Group Retford (ChargePoint)?
Chancery Lane, Retford, DN22 6eu (Charge Your Car) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Group Retford (ChargePoint)?
A typical 10–80% rapid charge takes about 24 min on the 175 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Group Retford (ChargePoint)?
A typical 10–80% rapid charge takes about 23 min on the 175 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Group Retford (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 175 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Strawson Group Developments Limited
- Chancery Lane, Retford, DN22 6eu
- Chancery Lane Car Park, 11 Chancery Lane
- Pod Point Co-op Petrol Filling Station
- Morrisons
- Co-op Hallcroft
- Cheapest nearby
- Pod Point Co-op Petrol Filling Station · 25.2p per kWh · 7 kW · 0.6 mi