Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Cransley Park EV Hub

Cransley Park Way, Cransley Park, Kettering, NN14 1FJ

Cransley Park EV Hub is an EV charging site in Kettering, North Northamptonshire, run by BP Pulse and open 24 hours a day. Its 25 sockets reach up to 300 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 35% uptime and recorded 839 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Cransley Park Way (ChargePoint), 30 yards away.

Status

4 of 25 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW20 connectors3 free1 out of service16 status unknown
BPA008395% reliabilityAvailable
BPA008395% reliabilityAvailable
BPA008443% reliabilityAvailable
BPA008443% reliabilityOut of order
BPA00850% reliabilityStatus unknown
BPA00850% reliabilityStatus unknown
BPA00860% reliabilityStatus unknown
BPA00860% reliabilityStatus unknown
CHAdeMO · 100 kW5 connectors1 free4 status unknown
BPA008395% reliabilityAvailable
BPA00850% reliabilityStatus unknown
BPA00870% reliabilityStatus unknown
BPA00890% reliabilityStatus unknown
BPA00910% reliabilityStatus unknown

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPA0083

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Cransley Park EV Hub (BP Pulse)?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does Cransley Park EV Hub (BP Pulse) have?

25 charging sockets: 20 × 300 kW CCS, 5 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Cransley Park EV Hub (BP Pulse) open 24/7?

Yes - Cransley Park EV Hub (BP Pulse) is open 24 hours a day, 7 days a week.

When is Cransley Park EV Hub (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Cransley Park EV Hub (BP Pulse)?

Amp Map measured 35% uptime here from recorded live status over the last 30 days, across 839 observed charging sessions.

Who operates Cransley Park EV Hub?

Cransley Park EV Hub is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Cransley Park EV Hub (BP Pulse)?

Cransley Park Way (ChargePoint) is 30 yards away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Cransley Park EV Hub (BP Pulse)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cransley Park EV Hub (BP Pulse)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Cransley Park EV Hub (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.