ChargePoint · EV charging site
Cransley Park Way
Cransley Park Way, Kettering, NN14 1FJ
Cransley Park Way is an EV charging site in Kettering, North Northamptonshire, run by ChargePoint. All 20 of its sockets are 150 kW CHAdeMO and CCS, and the price is listed as £0.83/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Cransley Park EV Hub (BP Pulse), 30 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.83/kWh(from Open Charge Map, 30 Jun 2025)
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cransley Park Way (ChargePoint)?
The listed price is £0.83/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Cransley Park Way (ChargePoint)?
Up to 150 kW DC via CHAdeMO, CCS.
How many charging sockets does Cransley Park Way (ChargePoint) have?
20 charging sockets: 5 × 150 kW CHAdeMO, 20 × 150 kW CCS.
Who operates Cransley Park Way?
Cransley Park Way is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to Cransley Park Way (ChargePoint)?
Cransley Park EV Hub (BP Pulse) is 30 yards away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cransley Park Way (ChargePoint)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cransley Park Way (ChargePoint)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cransley Park Way (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cransley Park EV Hub
- Macrow Cransley AC Station 1
- Macrow Cransley DC Station 1
- Trading Post Kettering
- Station Road (Kettering)
- Hawthorn Road
- Cheapest nearby
- Trading Post Kettering · 89p per kWh · 200 kW · 0.2 mi
- Fastest nearby
- Cransley Park EV Hub · 300 kW · 30 yd