BP Pulse · EV charging site
Finchley Lane SF Connect
14 Finchley Lane, Golders Green, NW4 1DL
Finchley Lane SF Connect is an EV charging site in Golders Green, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Amp Map measured 0% uptime here over the last 30 days. 21 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 70 Watford Way (BP Pulse), 0.5 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000480
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Finchley Lane SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does Finchley Lane SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Finchley Lane SF Connect (BP Pulse) open 24/7?
Yes - Finchley Lane SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
How reliable is Finchley Lane SF Connect (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Finchley Lane SF Connect?
Finchley Lane SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Finchley Lane SF Connect (BP Pulse)?
70 Watford Way (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Finchley Lane SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Finchley Lane SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Finchley Lane SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.