Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Gaywood Library Car Park

Gaywood Library Car Park, King's Lynn, PE30 4HD

Gaywood Library Car Park is an EV charging site in King's Lynn, Norfolk, run by BP Pulse. All 6 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 43% uptime and recorded 25 charging sessions here over the last 30 days. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - King's Lynn Gaywood, 150 yards away.

Status

2 of 6 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW6 connectors · 65p per kWh2 free1 in use3 out of service
FC177780% reliabilityOut of order
FC177780% reliabilityOut of order
FC17779100% reliabilityAvailable
FC17779100% reliabilityAvailable
FC177808% reliabilityCharging
FC177808% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
FC17778

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Gaywood Library Car Park (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Gaywood Library Car Park (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does Gaywood Library Car Park (BP Pulse) have?

6 charging sockets: 6 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Gaywood Library Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Gaywood Library Car Park (BP Pulse)?

Amp Map measured 43% uptime here from recorded live status over the last 30 days, across 25 observed charging sessions.

Who operates Gaywood Library Car Park?

Gaywood Library Car Park is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to Gaywood Library Car Park (BP Pulse)?

Pod Point Tesco Superstore - King's Lynn Gaywood is 150 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Gaywood Library Car Park (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gaywood Library Car Park (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Gaywood Library Car Park (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.