Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Jesse Boot Avenue

Jesse Boot Avenue, Nottingham, NG7 2QP

Jesse Boot Avenue is an EV charging site in Nottingham, run by BP Pulse. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the published price is £0.89 per kWh. Amp Map measured 0% uptime here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Nottingham Tennis Centre (BP Pulse), 0.2 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS or CHAdeMO or Type 2 · 50 kW2 connectors · 89p per kWhOut of service
249880% reliabilityOut of order
249940% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
24988

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CHAdeMO50 kW89p per kWh
CCS50 kW89p per kWh
Type 244 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Jesse Boot Avenue (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Jesse Boot Avenue (BP Pulse)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

How many charging sockets does Jesse Boot Avenue (BP Pulse) have?

2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 44 kW Type 2, 2 × 50 kW CCS. Live per-socket availability is shown on this page.

How reliable is Jesse Boot Avenue (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Jesse Boot Avenue?

Jesse Boot Avenue is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Jesse Boot Avenue (BP Pulse)?

Nottingham Tennis Centre (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Jesse Boot Avenue (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Jesse Boot Avenue (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Jesse Boot Avenue (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.