Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Nottingham City Council

Nottingham City Council, Willoughly Street, NG7 1JG

Nottingham City Council is an EV charging site in Nottingham, run by BP Pulse. Its 2 sockets reach up to 150 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Amp Map measured 0% uptime here over the last 30 days. 15 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Lenton Blvd (BP Pulse), 0.4 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 150 kW1 connector · 89p per kWhOut of service
BPA00800% reliabilityOut of order
CHAdeMO · 100 kW1 connector · 89p per kWhOut of service
BPA00800% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
BPA0080

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh
CHAdeMO100 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Nottingham City Council (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Nottingham City Council (BP Pulse)?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Nottingham City Council (BP Pulse) have?

2 charging sockets: 1 × 150 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

How reliable is Nottingham City Council (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Nottingham City Council?

Nottingham City Council is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Nottingham City Council (BP Pulse)?

Lenton Blvd (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Nottingham City Council (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nottingham City Council (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Nottingham City Council (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.