Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Mill Lane Car Park

Mill Lane Car Park, Mill Lane, Witham, CM8 1BW

Mill Lane Car Park is an EV charging site in Witham, Essex, run by BP Pulse. All 8 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 70% uptime and recorded 15 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is IONITY GmbH IONITY Witham, 0.9 miles away.

Status

6 of 8 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW8 connectors · 65p per kWh6 free2 out of service
14119100% reliabilityAvailable
14119100% reliabilityAvailable
14120100% reliabilityAvailable
14120100% reliabilityAvailable
1412196% reliabilityAvailable
1412196% reliabilityAvailable
141220% reliabilityOut of order
141220% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
14119

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Mill Lane Car Park (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Mill Lane Car Park (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does Mill Lane Car Park (BP Pulse) have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Mill Lane Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 7 pm. The live status on this page shows what is free before you set off.

How reliable is Mill Lane Car Park (BP Pulse)?

Amp Map measured 70% uptime here from recorded live status over the last 30 days, across 15 observed charging sessions.

Who operates Mill Lane Car Park?

Mill Lane Car Park is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to Mill Lane Car Park (BP Pulse)?

IONITY GmbH IONITY Witham is 0.9 miles away in a straight line, with up to 400 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Mill Lane Car Park (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Lane Car Park (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Mill Lane Car Park (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.