Fuuse · EV charging site
EG Riven Hall Starbucks
Rivenhall End, Witham, CM8 3HB
EG Riven Hall Starbucks is an EV charging site in Witham, Essex, run by Fuuse. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.55/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Superstore - Colchester Tiptree, 3.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.55/kWh(from Open Charge Map, 11 Oct 2023)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EG Riven Hall Starbucks (Fuuse)?
The listed price is £0.55/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EG Riven Hall Starbucks (Fuuse)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does EG Riven Hall Starbucks (Fuuse) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS.
Who operates EG Riven Hall Starbucks?
EG Riven Hall Starbucks is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest other charger with 50 kW or more to EG Riven Hall Starbucks (Fuuse)?
Pod Point Tesco Superstore - Colchester Tiptree is 3.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Riven Hall Starbucks (Fuuse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Riven Hall Starbucks (Fuuse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Riven Hall Starbucks (Fuuse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Witham station Car Park
- White Horse Lane Car Park Witham
- Newlands Drive Car Park
- Mill Lane Car Park
- Witham Leisure Centre
- Potters Lakes
- Cheapest nearby
- White Horse Lane Car Park Witham · 65p per kWh · 7 kW · 1.5 mi