BP Pulse · EV charging site
Miller & Carter Coventry
Kenpas Highway, Coventry, CV3 6PB
Miller & Carter Coventry is an EV charging site in Coventry, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 7 pm, and Amp Map measured 98% uptime and recorded 98 charging sessions here over the last 30 days. 16 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stonebridge SF Connect (BP Pulse), 160 yards away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPC0015
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Miller & Carter Coventry (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does Miller & Carter Coventry (BP Pulse) have?
2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is Miller & Carter Coventry (BP Pulse) open 24/7?
Yes - Miller & Carter Coventry (BP Pulse) is open 24 hours a day, 7 days a week.
When is Miller & Carter Coventry (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Miller & Carter Coventry (BP Pulse)?
Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 98 observed charging sessions.
Who operates Miller & Carter Coventry?
Miller & Carter Coventry is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Miller & Carter Coventry (BP Pulse)?
Stonebridge SF Connect (BP Pulse) is 160 yards away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Miller & Carter Coventry (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Miller & Carter Coventry (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Miller & Carter Coventry (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stonebridge SF Connect
- Meriden Street 2
- Fenside Avenue 1
- Postbridge Road
- Charminster Drive 3
- Charminster Drive 2
- Fastest nearby
- Stonebridge SF Connect · 150 kW · 160 yd