Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Connected Kerb · EV charging site

Meriden Street 2

Meriden Street 2, Coventry, CV1 4DL

Meriden Street 2 is an EV charging site in Coventry, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 15 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Miller & Carter Coventry (BP Pulse), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 May 2023Last verified 5 May 2023

Connectors

Type 2 · 7 kW2 connectors

Site information

Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Meriden Street 2 (Connected Kerb)?

Up to 7 kW AC via Type 2.

How many charging sockets does Meriden Street 2 (Connected Kerb) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.

Who operates Meriden Street 2?

Meriden Street 2 is on the Connected Kerb network.

Where is the nearest charger with 50 kW or more to Meriden Street 2 (Connected Kerb)?

Miller & Carter Coventry (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Meriden Street 2 (Connected Kerb)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Meriden Street 2 (Connected Kerb)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Meriden Street 2 (Connected Kerb)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 5 May 2023

Amp Map does not take payment. You pay the operator.