BP Pulse · EV charging site
Co-op Roman Bank Food Store
136-140 Roman Bank, Skegness, PE25 1SE
Co-op Roman Bank Food Store is an EV charging site in Skegness, Lincolnshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CHAdeMO and CCS. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 98% uptime and recorded 140 charging sessions here over the last 30 days. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is North Shore Hotel & Golf Club, 0.4 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPT071
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Co-op Roman Bank Food Store (BP Pulse)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Co-op Roman Bank Food Store (BP Pulse) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS. Live per-socket availability is shown on this page.
Is Co-op Roman Bank Food Store (BP Pulse) open 24/7?
Yes - Co-op Roman Bank Food Store (BP Pulse) is open 24 hours a day, 7 days a week.
When is Co-op Roman Bank Food Store (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Co-op Roman Bank Food Store (BP Pulse)?
Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 140 observed charging sessions.
Who operates Co-op Roman Bank Food Store?
Co-op Roman Bank Food Store is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Co-op Roman Bank Food Store (BP Pulse)?
North Shore Hotel & Golf Club is 0.4 miles away in a straight line, with up to 80 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Co-op Roman Bank Food Store (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Roman Bank Food Store (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Co-op Roman Bank Food Store (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- North Shore Hotel & Golf Club
- Pod Point Skegness Academy
- East Lindsey District Council
- Pod Point Skegness NHS CDC
- Morrisons Skegness
- East Lindsey Council
- Cheapest nearby
- Pod Point Skegness NHS CDC · 39.6p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- North Shore Hotel & Golf Club · 80 kW · 0.4 mi