BP Pulse · EV charging site
SPAR Moyle Road
60 Moyle Road, Ballycastle, BT54 6LG
SPAR Moyle Road is an EV charging site in Ballycastle, Causeway Coast and Glens, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 97% uptime and recorded 151 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Salthouse (EZO (IE)), 1 mile away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000663
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at SPAR Moyle Road (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does SPAR Moyle Road (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is SPAR Moyle Road (BP Pulse) open 24/7?
Yes - SPAR Moyle Road (BP Pulse) is open 24 hours a day, 7 days a week.
When is SPAR Moyle Road (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is SPAR Moyle Road (BP Pulse)?
Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 151 observed charging sessions.
Who operates SPAR Moyle Road?
SPAR Moyle Road is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to SPAR Moyle Road (BP Pulse)?
The Salthouse (EZO (IE)) is 1 mile away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at SPAR Moyle Road (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at SPAR Moyle Road (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at SPAR Moyle Road (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.