ESB Ecars · EV charging site
DRD Car Park, Castle St, Ballycastle
Castle Street, Ballycastle, BT64 6AS
DRD Car Park, Castle St, Ballycastle is an EV charging site in Ballycastle, Causeway Coast and Glens, run by ESB Ecars. Both of its sockets are 22 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is SPAR Moyle Road (BP Pulse), 0.3 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1890 372 387
- Getting there
- Ecar Card needed.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at DRD Car Park, Castle St, Ballycastle (ESB Ecars)?
Up to 22 kW AC via Type 2.
How many charging sockets does DRD Car Park, Castle St, Ballycastle (ESB Ecars) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates DRD Car Park, Castle St, Ballycastle?
DRD Car Park, Castle St, Ballycastle is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest charger with 50 kW or more to DRD Car Park, Castle St, Ballycastle (ESB Ecars)?
SPAR Moyle Road (BP Pulse) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at DRD Car Park, Castle St, Ballycastle (ESB Ecars)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DRD Car Park, Castle St, Ballycastle (ESB Ecars)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at DRD Car Park, Castle St, Ballycastle (ESB Ecars)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- SPAR Moyle Road · 150 kW · 0.3 mi