Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Stafford Borough Council

Stafford Borough Council, Doxey Road, ST16 2TF

Stafford Borough Council is an EV charging site at Stafford Borough Council, Doxey Road in Stafford, Staffordshire, run by BP Pulse. All 12 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 43% uptime and recorded 13 charging sessions here over the last 30 days. Amp Map lists 1 other charge point named Stafford Borough Council in Stafford. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Doxey Road Car Park (POGO), 20 yards away.

Status

6 of 12 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW12 connectors · 65p per kWh6 free6 out of service
FC18135100% reliabilityAvailable
FC18135100% reliabilityAvailable
FC18136100% reliabilityAvailable
FC18136100% reliabilityAvailable
FC18137100% reliabilityAvailable
FC18137100% reliabilityAvailable
FC181390% reliabilityOut of order
FC181390% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
FC18135

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Stafford Borough Council (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Stafford Borough Council (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does Stafford Borough Council (BP Pulse) have?

12 charging sockets: 12 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Stafford Borough Council (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 10 am. The live status on this page shows what is free before you set off.

How reliable is Stafford Borough Council (BP Pulse)?

Amp Map measured 43% uptime here from recorded live status over the last 30 days, across 13 observed charging sessions.

Who operates Stafford Borough Council?

Stafford Borough Council is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to Stafford Borough Council (BP Pulse)?

Doxey Road Car Park (POGO) is 20 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Stafford Borough Council (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stafford Borough Council (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Stafford Borough Council (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.