Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

Broad Street Surface Car Park

Broad Street, Stafford, ST16 2DB

Broad Street Surface Car Park is an EV charging site in Stafford, Staffordshire, run by POGO. Its 6 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.56 per kWh. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Windmill Carpark (BP Pulse), 0.1 miles away.

Status

Not reporting

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW2 connectors · 56p per kWhStatus unknown
SEC50301Status unknown
SEC50302Status unknown
CHAdeMO · 50 kW2 connectors · 56p per kWhStatus unknown
SEC50301Status unknown
SEC50302Status unknown
Type 2 · 22 kW2 connectors · 56p per kWhStatus unknown
SEC50301Status unknown
SEC50302Status unknown

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
SEC50301
Bays
Taxi only

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

56p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Broad Street Surface Car Park (POGO)?

The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Broad Street Surface Car Park (POGO)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Broad Street Surface Car Park (POGO) have?

6 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Who operates Broad Street Surface Car Park?

Broad Street Surface Car Park is on the POGO network.

Where is the nearest other charger with 50 kW or more to Broad Street Surface Car Park (POGO)?

Windmill Carpark (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Broad Street Surface Car Park (POGO)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Broad Street Surface Car Park (POGO)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Broad Street Surface Car Park (POGO)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.