POGO · EV charging site
Broad Street Surface Car Park
Broad Street, Stafford, ST16 2DB
Broad Street Surface Car Park is an EV charging site in Stafford, Staffordshire, run by POGO. Its 6 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.56 per kWh. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Windmill Carpark (BP Pulse), 0.1 miles away.
Status
Not reporting
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 22 kW
Site information
- Operator
- POGO
- Opening hours
- Not published
- Payment
- In the PoGo Charge appRFID card
- Charger ID
- SEC50301
- Bays
- Taxi only
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
56p per kWh
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Broad Street Surface Car Park (POGO)?
The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Broad Street Surface Car Park (POGO)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Broad Street Surface Car Park (POGO) have?
6 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Who operates Broad Street Surface Car Park?
Broad Street Surface Car Park is on the POGO network.
Where is the nearest other charger with 50 kW or more to Broad Street Surface Car Park (POGO)?
Windmill Carpark (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Broad Street Surface Car Park (POGO)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Broad Street Surface Car Park (POGO)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Broad Street Surface Car Park (POGO)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.