Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Starbucks, Brookside Retail Park

Brookside Retail Park, Rugeley, ST14 8AU

Starbucks, Brookside Retail Park is an EV charging site in Rugeley, Staffordshire, run by BP Pulse and open 24 hours a day. Its 13 sockets reach up to 300 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 98% uptime and recorded 741 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Trinity Square Car Park (BP Pulse), 0.2 miles away.

Status

13 of 13 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 300 kW10 connectors10 free
BPA009797% reliabilityAvailable
BPA009797% reliabilityAvailable
BPA009898% reliabilityAvailable
BPA009898% reliabilityAvailable
BPA009998% reliabilityAvailable
BPA009998% reliabilityAvailable
BPA010097% reliabilityAvailable
BPA010097% reliabilityAvailable
BPA010199% reliabilityAvailable
BPA010199% reliabilityAvailable
CHAdeMO · 100 kW3 connectors3 free
BPA009797% reliabilityAvailable
BPA009898% reliabilityAvailable
BPA010097% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPA0097

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Starbucks, Brookside Retail Park (BP Pulse)?

Up to 300 kW DC via CHAdeMO, CCS.

How many charging sockets does Starbucks, Brookside Retail Park (BP Pulse) have?

13 charging sockets: 3 × 100 kW CHAdeMO, 10 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Starbucks, Brookside Retail Park (BP Pulse) open 24/7?

Yes - Starbucks, Brookside Retail Park (BP Pulse) is open 24 hours a day, 7 days a week.

When is Starbucks, Brookside Retail Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Starbucks, Brookside Retail Park (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 741 observed charging sessions.

Who operates Starbucks, Brookside Retail Park?

Starbucks, Brookside Retail Park is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Starbucks, Brookside Retail Park (BP Pulse)?

Trinity Square Car Park (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Starbucks, Brookside Retail Park (BP Pulse)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks, Brookside Retail Park (BP Pulse)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Starbucks, Brookside Retail Park (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.