EG Group EV Point · EV charging site
EG Group Uttoxeter Services
A50, Rugeley, ST14 5AU
EG Group Uttoxeter Services is an EV charging site in Rugeley, Staffordshire, run by EG Group EV Point. All 8 of its sockets are 250 kW CCS, and the price is listed as £0.65/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Premier Inn (GeniePoint), 110 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EG Group EV Point
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.65/kWh(from Open Charge Map, 25 Mar 2024)
- Notes
- Hardware design is Tesla V4 Supercharger, but operated by EG Group under their evpoint brand.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EG Group Uttoxeter Services (EG Group EV Point)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EG Group Uttoxeter Services (EG Group EV Point)?
Up to 250 kW DC via CCS.
How many charging sockets does EG Group Uttoxeter Services (EG Group EV Point) have?
8 charging sockets: 8 × 250 kW CCS.
Who operates EG Group Uttoxeter Services?
EG Group Uttoxeter Services is on the EG Group EV Point network.
Where is the nearest other charger with 50 kW or more to EG Group Uttoxeter Services (EG Group EV Point)?
Premier Inn (GeniePoint) is 110 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Group Uttoxeter Services (EG Group EV Point)?
A typical 10–80% rapid charge takes about 22 min on the 250 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Group Uttoxeter Services (EG Group EV Point)?
A typical 10–80% rapid charge takes about 23 min on the 250 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Group Uttoxeter Services (EG Group EV Point)?
A typical 10–80% rapid charge takes about 39 min on the 250 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Premier Inn
- Pod Point Tesco Superstore - Uttoxeter
- Bank House Hotel
- Starbucks, Brookside Retail Park
- Trinity Square Car Park
- Shell Recharge Shell Uttoxeter
- Cheapest nearby
- Pod Point Tesco Superstore - Uttoxeter · 44.4p per kWh · 7 kW · 0.6 mi
- Fastest nearby
- Starbucks, Brookside Retail Park · 300 kW · 0.7 mi