BP Pulse · EV charging site
Uniper Cottam Development Centre Power Station
Uniper Cottam Development Centre Power Statio, Gainsborough, DN22 0TF
Uniper Cottam Development Centre Power Station is an EV charging site in Gainsborough, Lincolnshire, run by BP Pulse. Both of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 57% uptime and recorded 31 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is CO-OP Sturton by Stow (BP Pulse), 5 miles away.
Status
0 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- PB0008986
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Uniper Cottam Development Centre Power Station (BP Pulse)?
Up to 7 kW AC via Type 2.
How many charging sockets does Uniper Cottam Development Centre Power Station (BP Pulse) have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Uniper Cottam Development Centre Power Station (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 5 pm. The live status on this page shows what is free before you set off.
How reliable is Uniper Cottam Development Centre Power Station (BP Pulse)?
Amp Map measured 57% uptime here from recorded live status over the last 30 days, across 31 observed charging sessions.
Who operates Uniper Cottam Development Centre Power Station?
Uniper Cottam Development Centre Power Station is on the BP Pulse network.
Where is the nearest charger with 50 kW or more to Uniper Cottam Development Centre Power Station (BP Pulse)?
CO-OP Sturton by Stow (BP Pulse) is 5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Uniper Cottam Development Centre Power Station (BP Pulse)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Uniper Cottam Development Centre Power Station (BP Pulse)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Uniper Cottam Development Centre Power Station (BP Pulse)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.