Chargemaster · EV charging site
Torksey
Torksey, Gainsborough, LN1 2EH
Torksey is an EV charging site in Gainsborough, Lincolnshire, run by Chargemaster. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is CO-OP Sturton by Stow (BP Pulse), 3.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Private · membership required
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Torksey (Chargemaster)?
Up to 22 kW AC via Type 2.
How many charging sockets does Torksey (Chargemaster) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 22 kW Type 2.
Who operates Torksey?
Torksey is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Can anyone charge at Torksey (Chargemaster)?
The operator lists this charger as private - access is restricted.
Where is the nearest charger with 50 kW or more to Torksey (Chargemaster)?
CO-OP Sturton by Stow (BP Pulse) is 3.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Torksey (Chargemaster)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Torksey (Chargemaster)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Torksey (Chargemaster)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- CO-OP Sturton by Stow · 89p per kWh · 50 kW · 3.5 mi
- Fastest nearby
- CO-OP Sturton by Stow · 50 kW · 3.5 mi