Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Volvo Cars Dundee

Volvo Cars Dundee, Rutherford Rd, Dryburgh In, DD2 3XH

Volvo Cars Dundee is an EV charging site in Dundee, Dundee City, run by BP Pulse. All 10 of its sockets are 22 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 26% uptime and recorded 19 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Dundee, Broomhill Road (Source EV), 0.1 miles away.

Status

4 of 10 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 22 kW10 connectors · 65p per kWh4 free6 out of service
FC155900% reliabilityOut of order
FC155900% reliabilityOut of order
FC157710% reliabilityOut of order
FC157710% reliabilityOut of order
FC158060% reliabilityOut of order
FC158060% reliabilityOut of order
FC15813100% reliabilityAvailable
FC15813100% reliabilityAvailable
FC15814100% reliabilityAvailable
FC15814100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
FC15590

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Volvo Cars Dundee (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Volvo Cars Dundee (BP Pulse)?

Up to 22 kW AC via Type 2.

How many charging sockets does Volvo Cars Dundee (BP Pulse) have?

10 charging sockets: 10 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Volvo Cars Dundee (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around noon. The live status on this page shows what is free before you set off.

How reliable is Volvo Cars Dundee (BP Pulse)?

Amp Map measured 26% uptime here from recorded live status over the last 30 days, across 19 observed charging sessions.

Who operates Volvo Cars Dundee?

Volvo Cars Dundee is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to Volvo Cars Dundee (BP Pulse)?

Dundee, Broomhill Road (Source EV) is 0.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Volvo Cars Dundee (BP Pulse)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Volvo Cars Dundee (BP Pulse)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Volvo Cars Dundee (BP Pulse)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.