Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Tesco Customer Engagement Centre - Dundee

Baird Avenue Dryburgh Industrial Estate, Dundee, DD2 3TN

Pod Point Tesco Customer Engagement Centre - Dundee is an EV charging site in Dundee, Dundee City, run by Pod Point. All 14 of its sockets are 7 kW Type 2, and the published price is £0.44 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 92% uptime and recorded 83 charging sessions here over the last 30 days. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Angus Court (Fastned), 0.3 miles away.

Status

13 of 14 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW14 connectors · 44.4p per kWh13 free1 out of service
Bing-Mary0% reliabilityAvailable
Bing-Mary0% reliabilityOut of order
Demi-Hans100% reliabilityAvailable
Demi-Hans100% reliabilityAvailable
Dion-Mark100% reliabilityAvailable
Dion-Mark100% reliabilityAvailable
Eddy-Jade100% reliabilityAvailable
Eddy-Jade100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Bing-Mary

Facilities

SupermarketTesco

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW44.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£25
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£18
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£23
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£23
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£19
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£18
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£12

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Tesco Customer Engagement Centre - Dundee?

The listed price is £0.44/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Tesco Customer Engagement Centre - Dundee?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Tesco Customer Engagement Centre - Dundee have?

14 charging sockets: 14 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Tesco Customer Engagement Centre - Dundee busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Tesco Customer Engagement Centre - Dundee?

Amp Map measured 92% uptime here from recorded live status over the last 30 days, across 83 observed charging sessions.

Who operates Pod Point Tesco Customer Engagement Centre - Dundee?

Pod Point Tesco Customer Engagement Centre - Dundee is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Tesco Customer Engagement Centre - Dundee?

Angus Court (Fastned) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Tesco Customer Engagement Centre - Dundee?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tesco Customer Engagement Centre - Dundee?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tesco Customer Engagement Centre - Dundee?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.