EV charging site
Building 101 Cambridge Science Park
Cambridge Science Park, CB4 0FY
Building 101 Cambridge Science Park is an EV charging site in Cambridge, Cambridgeshire. All 6 of its sockets are 7 kW Type 2, and charging is listed as free. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Golden Hind (Cambridge) (evyve), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 1 Nov 2019)
- Notes
- Customers and Staff
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Building 101 Cambridge Science Park?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Building 101 Cambridge Science Park?
Up to 7 kW AC via Type 2.
How many charging sockets does Building 101 Cambridge Science Park have?
6 charging sockets: 6 × 7 kW Type 2.
Can anyone charge at Building 101 Cambridge Science Park?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Building 101 Cambridge Science Park?
Golden Hind (Cambridge) (evyve) is 0.4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Building 101 Cambridge Science Park?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Building 101 Cambridge Science Park?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Building 101 Cambridge Science Park?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Maurice Wilkes Building
- Golden Hind (Cambridge)
- Cambridge Science Park
- Pod Point Tesco Superstore - Cambridge Milton
- Building 406, Cambridge Science Park
- Cambridge Sq Cambridge Sq 3
- Cheapest nearby
- Pod Point Maurice Wilkes Building · 30p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Golden Hind (Cambridge) · 75 kW · 0.4 mi