Connected Kerb · EV charging site
Building 406, Cambridge Science Park
Building 406, Cambridge Science Park, CB4 0WW
Building 406, Cambridge Science Park is an EV charging site in Cambridge, Cambridgeshire, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Golden Hind (Cambridge) (evyve), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Building 406, Cambridge Science Park (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Building 406, Cambridge Science Park (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Building 406, Cambridge Science Park?
Building 406, Cambridge Science Park is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Building 406, Cambridge Science Park (Connected Kerb)?
Golden Hind (Cambridge) (evyve) is 0.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Building 406, Cambridge Science Park (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Building 406, Cambridge Science Park (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Building 406, Cambridge Science Park (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cambridge Science Park
- Cambridge Regional College
- Cambridge Regional College
- Cambridge Regional College
- Allia Future Business Centre1
- Building 101 Cambridge Science Park
- Fastest nearby
- Allia Future Business Centre1 · 22 kW · 0.3 mi